Close Menu
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    • About Us
    • Privacy Policy
    • Terms Of Service
    • Advertisement
    Tuesday, June 9
    Facebook X (Twitter) Instagram Pinterest Vimeo
    ABS Africa TV
    • Breaking News
    • Africa News
    • World News
    • Editorial
    • Environ/Climate
    • More
      • Cameroon
      • Ambazonia
      • Politics
      • Culture
      • Travel
      • Sports
      • Technology
      • AfroSingles
    • Donate
    Subscription
    ABS Africa TV
    Home»Travel»Nigeria: Five Years After Rehabilitation, Enugu Airport Runway Fails Again
    Travel

    Nigeria: Five Years After Rehabilitation, Enugu Airport Runway Fails Again

    Chukwu GodloveBy Chukwu GodloveApril 23, 2025No Comments5 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Nigeria: Five Years After Rehabilitation, Enugu Airport Runway Fails Again
    Share
    Facebook Twitter LinkedIn Pinterest Email
    Post Views: 22


    • Emergency rehabilitation gulped N10bn

    Mixed reactions have trailed the decision of the federal government to shut down the Akanu Ibiam International Airport in Enugu, Enugu State.

    The temporary closure of the airport, the only international airport in the South East, for emergency repairs of the runway, came five years after a similar closure by the then administration of President Muhammadu Buhari.

    Buhari at the time approved the sum of N10bn for emergency repair of the airport including the dilapidated runway and other ancillary works.

    Following the completion of the runway repair which was asphalted, former minister of Aviation, Senator Hadi Sirika, reopened the runway, bringing relief to the South East which had endured the pains of the closure and diversion of traffic to other airports in the axis.

    However, the asphalted runway has failed again despite the repair which has forced the Federal Airports Authority of Nigeria (FAAN) to shut down the airport again.

    Air Peace, one of the airlines operating to the airport, was the first to announce suspension of flights, citing safety concerns.

    Dr Ejike Ndiulo, Head of Corporate Communications of Air Peace who confirmed the decision in a statement, said safety issues at Enugu Airport have been causing disruption to Air Peace flights.

    But FAAN’s Director of Public Affairs and Consumer Protection, Obiageli Orah, in a statement announced the shutdown of the airport following “a sudden and significant rupture in the asphalt surface at a critical section of the runway.”

    She said emergency repairs will be conducted on that portion of the runway from April 22 to May 6, 2025.

    “In compliance with Nigerian civil aviation regulations, the Federal Airports Authority of Nigeria (FAAN) has, therefore, closed the runway during this period.

    “As part of FAAN’s commitment to passenger safety and the modernisation of airport facilities, the runway will not be open for landings or takeoffs during the rehabilitation period.”

    Our correspondent learnt that airlines have diverted flights to airports close to Enugu, namely, the Sam Mbakwe Airport, Owerri in Imo State and the Asaba Airport, Delta State.

    The Enugu airport serves nearby cities, including Onitsha, Nnewi, Awka, Abakaliki, Okigwe, Afikpo, Ugep, Orlu and Idah.

    Daily Trust learnt that the runway has virtually returned to its old self, causing pilots to experience hard landing on it.

    A source at the airport confirmed that the rupture was caused by a waterlogged portion of the airport which the rehabilitation carried out in 2020 failed to address.

    “So, anytime it rains, the waterlogged portion of the runway continues to weaken the asphalted surface, making landing bumpy for aircraft,” a source who understands the terrain of the airport said.

    The Minister of Aviation and Aerospace Development, Festus Keyamo, SAN, however, said the shutdown would take effect from April 22, 2025, while apologising to Nigerians over the development, saying, “The airport is our major international gateway in the Southeastern part of Nigeria.”

    “It will be recalled that this same challenge led to the closure of the runway in August 2019 a whole year and the contract for the total rehabilitation was awarded to a contractor.

    “Unfortunately, when we came to the office, we discovered that a waterlogged part of the runway was not properly constructed to take care of the problem, leading to constant cracks and potholes on the runway. These obviously put the lives of the travelling public at great risk.

    “We have been carrying out constant palliative works on it, but the problem has not abated and the cracks on the runway are becoming craters. I personally visited the airport some months after assuming office and expressed my total displeasure with the work done by the contractor.

    Sign up for free AllAfrica Newsletters

    Get the latest in African news delivered straight to your inbox


    Success!

    Almost finished…

    We need to confirm your email address.

    To complete the process, please follow the instructions in the email we just sent you.


    Error!

    There was a problem processing your submission. Please try again later.

    “In the meantime, scheduled flight operations to Enugu will be diverted to other neighbouring airports. We are going to work tirelessly to meet the timeline in order to mitigate the inconvenience this closure will cause the travelling public.”

    A former senior official with FAAN, who spoke with our correspondent on the airport, said the waterlogged section has remained problematic unless a permanent engineering solution was proffered.

    He suggested that the failing portion could be addressed by constructing a culvert underneath the runway to always soak the water which usually weakens asphalt.

    Aviation analyst, Group Capt. John Ojikutu, rtd, said considering that the runway has been undergoing rehabilitation from time to time, the professionals in the agencies should be allowed to take charge.

    “It is all because the political office holders are the ones in charge and not the professional operators and the necessary concern for the regulatory authority,” he said.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Chukwu Godlove

      Related Posts

      Breaking Down Borders Africa earns global recognition with Silver Telly Award

      June 9, 2026

      Africa: ‘A World Cup for Them Not Us’ – Fans’ Anger At US Travel Bans and Visa Restrictions

      June 9, 2026

      Table Mountain Cableway annual maintenance closure announced for late July

      June 9, 2026
      Leave A Reply Cancel Reply

      ABS TV and ABS Network News is a leading Pan-African 24/7 broadcasting network delivering nonstop news, talk shows, lifestyle programs, and digital media content worldwide through Satellite, Streaming Platforms, and Roku TV.
       
      Based in the United States, we connect Africa to the world while empowering creators, journalists, and brands through innovative media and broadcasting services.
      Facebook X (Twitter) Pinterest WhatsApp Instagram

      Our Picks

      Sports

      France 1-0 Republic of Ireland: Pain in Grenoble but hope for Irish as World Cup play-offs loom

      World News

      Mark McAfee Promotes the Wonders of Raw Milk. It Has Sickened Hundreds, Regulators Say. — ProPublica

      Sports

      Benfica confirm Mourinho to leave for Real Madrid – with ex-Fulham boss Silva hired as replacement

      Most Popular

      Travel

      Breaking Down Borders Africa earns global recognition with Silver Telly Award

      Technology

      Eskom Green to build 32GW of renewables by 2040

      World News

      Serena Williams wins on return at Queen’s after nearly four years away from tennis

      © 2026 Copyright. All Rights Reserved by ABSAFRICATV
      • Privacy Policy
      • Terms of Services

      Type above and press Enter to search. Press Esc to cancel.

      We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.