Close Menu
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    • About Us
    • Privacy Policy
    • Terms Of Service
    • Advertisement
    Friday, October 16
    Facebook X (Twitter) Instagram Pinterest Vimeo
    ABS Africa TV
    • Breaking News
    • Trending
    • Africa News
    • World News
    • Features
    • Technology
    • Sports
    • Politics
    • More
      • Culture
      • Lifestyle
      • Travel
      • Business
      • Environment
      • Legal
      • Health
      • Cameroon
      • Ambazonia
      • AfroSingles
      • Environ/Climate
      • Editorial
      • The Leak Magazine
    • Donate
    Subscription
    ABS Africa TV
    Home»Business»Afentra advances Impala
    Business

    Afentra advances Impala

    Monah AnthonyBy Monah AnthonyOctober 16, 2026No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Afentra advances Impala
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Afentra advances Impala-2 and Pacassa SW wells in Angola

    16-10-2026
    By Pie Kamau | Channel: oil-gas
     | Tags: Angola
    Energy
    Oil & Gas
    Upstream Oil and Gas

    Afentra advances Impala-2 and Pacassa SW wells in Angola

    Impala-2 targets 4,000 barrels per day from January 2027

    Afentra, an upstream oil and gas company focused on production and development assets in Africa, is advancing two key wells in Angola’s offshore Block 3/05, with drilling of the Impala-2 development well set to begin in mid-October 2026 and the Pacassa SW discovery scheduled for a subsequent sidetrack and completion programme.

    The Borr Grid drilling rig will move directly to Impala-2 before returning to Pacassa SW, allowing drilling at the Impala field to proceed while final preparations and equipment mobilisation for the Pacassa sidetrack are completed.

    Impala-2 is expected to deliver first oil in January 2027, while production from Pacassa SW is targeted for the first quarter of 2027.

    Impala-2 is expected to spud in mid-October, with drilling and completion operations taking approximately 80 days. Completion is targeted for the end of December, followed by first oil in January 2027 at an initial gross production rate of approximately 4,000 barrels of oil per day.

    The well represents the next stage in the redevelopment of the Impala field. Reservoir pressure and productivity data obtained during the successful Impala-1 intervention, which restarted production from the well, have been incorporated into final planning for Impala-2.

    Completion of Impala-2 is also expected to support a material incremental re

    Paul McDade, CEO of Afentra, said: “The decision to move directly to Impala-2 provides operational flexibility, optimises the Block 3/05 drilling programme and enables us to maintain operational momentum. With preparations for the Impala-2 well complete, the revised sequencing allows drilling to progress immediately while final planning and equipment mobilisation for the Pacassa SW sidetrack are completed.”

    Joint venture partners agree $60 million Impala-2 cost cap

    The Block 3/05 joint venture partners have elected to fund Impala-2 directly rather than use the previously agreed carry mechanism, with the well subject to a reduced gross cost cap of $60 million.

    The direct funding structure allows Afentra to participate in production revenues from first oil while benefiting from the full capital expenditure uplift available under the Block 3/05 Production Sharing Contract. The retained cost cap also provides Afentra with protection against potential cost overruns.

    “The joint venture partners’ decision to fund Impala-2 directly enables Afentra to participate in production revenues from first oil, currently expected in January 2027, while benefiting from the full capital expenditure uplift available under the Block 3/05 PSC. Importantly, the retained well cost cap mechanism continues to provide Afentra with protection against cost overruns,” McDade said.

    Pacassa SW sidetrack follows 136 metres of net oil pay

    Pacassa SW will be sidetracked and completed after work on Impala-2 is finished. The discovery well encountered 136 metres of net oil pay but requires a sidetrack following operational problems that restricted access to the wellbore.

    Once Impala-2 has been completed, the Borr Grid rig will return to Pacassa SW for the sidetrack and completion programme. First oil is expected during the first quarter of 2027 following connection to the existing Pacassa production infrastructure.

    Remapping of the Pacassa SW discovery is continuing using results from the discovery well. The work is expected to assess incremental oil retimates made before drilling. Updated oil-in-place and rerk

    “Pacassa SW remains a high-priority discovered refirming the material potential we see in this area. Following Impala-2, the rig will return to Pacassa SW to sidetrack and complete the well, preserving a clear, efficient pathway to bringing both wells into production in Q1 2027,” McDade said

    Block 3/05 programme builds towards production and cash flow growth

    The two wells form part of a broader programme across Afentra’s Angolan portfolio. Near-term activity includes a trading update expected in November 2026, completion of the Etu transaction and further work on the redevelopment of the KON4 Quenguela Norte field.

    Afentra also plans to provide further information on the exploration potential of its Kwanza Onshore portfolio, while a hydraulic workover programme at Block 3/05 is scheduled to begin in early 2027.

    “Together with our partners, we continue to take a disciplined, pragmatic approach to the redevelopment of Block 3/05. We now have two important production wells progressing through the programme, providing the potential for meaningful near-term production and cash flow growth as we continue to unlock the significant value within the asset,” McDade said.

    Are you interested in having your interview published on our website, click here.

      Become a member of Africa Business Communities

    Events

    29 October 2026 | Open Webinar | The Hidden Costs of Operating Across Emerging Markets

    31 October 2026 | GDG Arusha DevFest 2026 | Arusha

    22 October 2026 | Greenshift Sustainability Forum | Nairobi

    Views: 32

    Advances Afentra Impala
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Monah Anthony
    • Website

    Related Posts

    Morocco could become an even bigger defence production base for one of India’s most profitable companies

    October 15, 2026

    IMF World Economic Output Press Briefing

    October 14, 2026

    Pakistan turns to Africa’s second-largest crude oil producer, Libya, as Middle East supply disruptions drive search for alternatives

    October 13, 2026
    Leave A Reply Cancel Reply

    Search
    Latest Post

    Africa powers travel growth

    October 16, 2026

    Vancouver police, school board investigating ‘disturbing online behaviour’ – BC

    October 16, 2026

    The Afghan Variable in Europe’s Eurasia Strategy

    October 16, 2026

    NIGERIA TO STAGE AFRICA’S FINAL SUB-REGIONAL QUALIFIER ON ROUTE TO ICC MEN’S T20 WORLD CUP 2028

    October 16, 2026

    New Gabon oil volumes, Cameroon drilling plans, Angola milestones

    October 16, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • TikTok
    ABS TV and ABS Network News is a leading Pan-African 24/7 broadcasting network delivering nonstop news, talk shows, lifestyle programs, and digital media content worldwide through Satellite, Streaming Platforms, and Roku TV.
     
    Based in the United States, we connect Africa to the world while empowering creators, journalists, and brands through innovative media and broadcasting services.
    Facebook X (Twitter) Pinterest WhatsApp Instagram

    Our Picks

    Travel

    Africa powers travel growth

    World News

    Vancouver police, school board investigating ‘disturbing online behaviour’ – BC

    Africa News

    The Afghan Variable in Europe’s Eurasia Strategy

    Most Popular

    Features

    NIGERIA TO STAGE AFRICA’S FINAL SUB-REGIONAL QUALIFIER ON ROUTE TO ICC MEN’S T20 WORLD CUP 2028

    Trending

    New Gabon oil volumes, Cameroon drilling plans, Angola milestones

    Breaking News

    Conversation With Myself  

    © 2026 Copyright. All Rights Reserved by ABSAFRICATV
    • Privacy Policy
    • Terms of Services

    Type above and press Enter to search. Press Esc to cancel.

    We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.